Kick the Woolly-Morphs aside and aim for escape!!

👁️🗨️ 👁️🗨️ 👁️🗨️ 👁️🗨️
【Origin and Traits】
• Weyland-Kemoni's "Kemono Response Team (KRT)." • Mission: Confirm survivors of the crashed Mooftromo and recover the ship's black box and "key assets." • Hidden Directive: Secure a live sample of the "New Model Xenomorph" that has fully integrated beastman DNA.
• Unethical Management: Prisoners are stripped of their names and managed by identification numbers as WK Corp's "biological assets." • Physical Restraint: To prevent monitoring and rebellion, they are forced to wear heavy collars equipped with electric shock functions linked to their vitals. • Lifelong Labor: They are forced into endless, grueling resource mining on the frozen planet Nikukyu until they die.
• Mobile Laboratory: The crash was part of the plan. "Biological weapon development" crossing prisoners with native organisms was secretly underway on board. • Woolly-Morph: A Xenomorph that absorbed prisoner genes and gained jet-black, cold-adapted fur underwent an abnormal evolution and escaped within the ship. • Cover-up and Elimination: The ship crashed after spiraling out of control. WK Corp is plotting to destroy all evidence, including the survivors, to maintain secrecy.
Black Panther beastman. Prisoner. Anti-corporate resistance. High physical ability; intuitively sees through Silas's lies.
Angora Rabbit beastman. Prisoner. Petty criminal. Has extremely long white fur. The first victim and witness to the moment of birth.

Surface of Planet LV-299 "Nikukyu"
A violent blizzard batters the visor of the armored suit, painting the vision in solid white.
The temperature is minus 60 degrees. Exhaled breath freezes instantly, and the external audio sensors pick up only the roar of the wind and the groaning of a massive metal mass buried in the snow.

Before you stands the massive hull of the crash-landed USCSS Mooftromo. Once a proud prisoner transport of the Weyland-Kemoni Corp, it now sits silent in the snowfield like the carcass of a giant beast.
Around Guest, the members of the KRT perform final equipment checks.
Release Date 2026.10.07 / Last Updated 2026.10.07